Nvidia: The Long View
What the filings say about its story, dilution and cash runway.
Disclosure: one or more of our editors own shares of Nvidia (NVDA) as a long-term investment. This page is information, not investment advice.
1. In one paragraph
Last updated Oct 27, 2026. Reflects the 10-K for fiscal 2026 and the Q2 fiscal 2027 10-Q.
Nvidia designs chips, networking equipment, computer systems and software used to train artificial intelligence (AI) models and to run them to produce answers (inference), and pays partners to manufacture them (mainly Taiwan Semiconductor Manufacturing Company, TSMC, for chips, and contract assemblers for systems). Almost all of its money now comes from data-centre sales: Compute & Networking was 89.6% of fiscal 2026 revenue of $215.9B.
- Segments, fiscal 2026 (filing): Compute & Networking 89.6% and Graphics (gaming and workstation graphics processing units, or GPUs) 10.4%.
- Markets, fiscal 2026 (filing; our calculation)1: data-centre compute 75.2%, networking 14.5%, gaming 7.4%, professional visualization 1.5%, automotive 1.1% and other 0.3%.
- Platforms since Q1 fiscal 2027 (filing): Data Center is 93% of Q2’s $96.2B and Edge Computing (PCs, workstations, cars and robotics) 7%. The reportable segments remain Compute & Networking and Graphics.
Chart source2.
Sources2
2. Story so far
Last updated Oct 27, 2026. Reflects filings and company releases through Oct 26, 2026.
In short: Nvidia went from a maker of graphics chips for games and data centres to a leading supplier of AI data-centre systems once demand surged in 2023: revenue rose from $27.0B in fiscal 2023 to $215.9B in fiscal 2026. US export restrictions began covering its A100 and H100 chips in 2022, expanded to the China-specific A800 and H800 in 2023, and reached the H20 in April 2025 (Nvidia filings). Since late 2025 it has increasingly invested in, and guaranteed obligations of, the AI companies that buy its systems.
| Date | Milestone | Source |
|---|---|---|
| Aug 26, 2022 | The US government requires a licence to export A100 and H100 AI chips to China and Russia. | 8-K |
| May 24, 2023 | ★ Nvidia guides next-quarter revenue to $11.0 billion, against $7.19 billion just reported: the start of the AI-driven surge. | Q1 FY2024 release |
| Mar 18, 2024 | Blackwell, the next chip generation, is announced. | Nvidia release |
| Apr 9–14, 2025 | ★ The US requires a licence for H20 chips sold to China; Nvidia later books a $4.5 billion charge for excess H20 inventory and purchase commitments. | 8-K · 10-Q Q2 FY2027 |
| Sep 22, 2025 | ★ Nvidia says it intends to invest up to $100 billion in OpenAI as 10 gigawatts of Nvidia systems are deployed. On Feb 27, 2026, OpenAI announced $30 billion of investment from Nvidia in its new funding round. | Nvidia release · OpenAI |
| Dec 2025 | Non-exclusive licence of Groq’s inference-chip technology plus hiring of Groq staff, for about $17 billion. | 10-K FY2026 (Note 2) |
| Jan 5, 2026 | The Vera Rubin platform is launched. | Nvidia release |
| Feb 25, 2026 | Fiscal 2026 revenue of $215.9 billion, up 65%. | Q4 FY2026 release |
| May 18, 2026 | Quarterly dividend raised from $0.01 to $0.25 per share; $80 billion added to the buyback authorization. | 10-Q Q2 FY2027 (Note 12) |
| Jun 2026 | $25 billion of senior notes issued in seven tranches. | 8-K |
| Aug 2026 | Guarantees of up to $105 billion for OpenAI’s leases at SB Energy’s Ohio data-centre campus. | 8-K |
| Aug 26, 2026 | ★ Record $96.2 billion quarter; year-ahead guidance (about 70% revenue growth in fiscal 2028; Nvidia said it had never before guided a year in advance); Vera Rubin production shipments under way. | Q2 FY2027 release · call transcript |
| Sep 2, 2026 | Agreement to buy Hugging Face for about $11.9 billion plus up to $1.0 billion of retention equity; closing expected in the first half of 2027. | 8-K |
| Sep 28, 2026 | $150 billion added to the buyback authorization, bringing the remaining authorization to $235 billion; Nvidia expects to execute it through fiscal 2028 (an authorization is not a purchase). | Nvidia release |
| Oct 23, 2026 | Start of our coverage: Why AI infrastructure stocks are falling discusses Nvidia’s guarantees and capacity commitments. | WhyMyStockMoved |
Links in the table accessed Oct 27, 2026.
3. Latest quarter: did the story change?
Last updated Nov 17, 2026. Reflects Q3 fiscal 2027 (quarter ended Oct 25, 2026; reported Nov 17) from the results release, CFO commentary and call; the 10-Q is not yet filed. First report since Jensen Huang resigned as CEO on Nov 11; CFO Colette Kress is interim CEO.
Bottom line: Revenue beat Nvidia’s own guide by 7.3%, the fourth-quarter guide is $130 billion and the fiscal 2028 outlook rose to about 75% growth, while gross margin dipped slightly as flagged in August and receivables, inventory and commitments grew again (company release, CFO commentary and call).
| Driver | Last quarter → this quarter | Management: before → now | Signal |
|---|---|---|---|
| Revenue and outlook | Revenue $96.2B → $115.8B; Data Center $89.0B → $107.6B (Hyperscale $48.7B → $60.1B; AI Clouds, Industrial & Enterprise $40.3B → $47.5B); Edge Computing $7.2B → $8.2B | Q3 guide $108.0B ±2% (Aug 26) → Q4 guide $130.0B ±3%, a quarter with an extra week, no China data-centre compute; fiscal 2028 growth outlook raised to about 75% from about 70% (Nov 17) | Better |
| Gross margin (revenue left after product costs, under US generally accepted accounting principles, GAAP) | 75.0% → 74.8%, a slight dip Nvidia ties to the initial Rubin ramp | 74% guided for Q3 and a Q4 low of 71–72% (Aug 26) → 71.0–72.0% guided for Q4, “our bottom”, then 72–73% in fiscal 2028 (Nov 17) | Unchanged |
| Receivables and inventory | Days sales outstanding 60 → 64; inventory $31.6B → $39.7B | Extended payment terms for certain investment-grade customers (Aug 26) → the same, plus shipment timing at the Rubin launch; inventory built for the Rubin ramp (Nov 17) | Worse |
| Commitments and guarantees | Supply commitments $279B → $390B, the increase mainly multi-year memory; maximum guarantee exposure $118.0B at quarter end ($105.0B SB Energy, $9.5B new power and systems credit support, $3.5B neocloud land, power and shell) | Supply a bottleneck at least through fiscal 2028 (Aug 26) → supply secured “to meet demand for the next several years”; no payments made under guarantees to date (Nov 17) | Watch |
| China | Guides assume no China data-centre compute revenue | Q3 guide assumed none (Aug 26) → $2.4B of Data Center Hopper products shipped to China in Q3; Nvidia is “no longer shipping” licensed Hopper data-centre products there; Q4 guide assumes none (Nov 17) | Watch |
Unresolved questions: how much of the receivables growth comes from extended terms; what the 10-Q adds on customers, guarantees and legal matters; who becomes permanent CEO (the chair said on the call the board “does not intend to reinstate Jensen as CEO”); what the new US licence rule for five countries means for sales.
Sources3
4. Buybacks vs real dilution (5 years)
Last updated Oct 27, 2026. Reflects the 10-Ks for fiscal 2024 and 2026 and the Q2 fiscal 2027 10-Q.
Dilution in one line: Shares outstanding fell 2.0% over five fiscal years, from 24,790M (Jan 31, 2021) to 24,304M (Jan 25, 2026), or about 0.4% a year compounded. If you owned 1% of Nvidia on Jan 31, 2021, you’d have owned 1.02% on Jan 25, 2026 without buying more. Buybacks retired 1,433M shares, 151% of the 946M net shares issued (our calculation)4. Basis: shares outstanding (Nvidia has one share class). Our scale: Net reduction (the share count fell).
Our rule of thumb: under 1% a year low, 1–3% moderate, over 3% high.
Change in the period Total since Jan 31, 2021
Shares outstanding at period end (all classes): 24.79B on Jan 31, 2021, 24.30B on Jan 25, 2026, −2.0% (our calculation). A bar below zero means the count fell (net buybacks).
Restated for the 4-for-1 (Jul 2021) and 10-for-1 (Jun 2024) stock splits.
Nvidia's fiscal year ends in late January; FY2026 is the year that ended in January 2026.
| Period end | Shares outstanding | Change | Buybacks (fiscal year) | Stock-based pay (fiscal year) | Stock pay as % of revenue |
|---|---|---|---|---|---|
| FY2026 (Jan 25, 2026) | 24.30B | −0.7% | $40.1B | $6.4B | 3% |
| FY2025 (Jan 26, 2025) | 24.48B | −0.7% | $33.7B | $4.7B | 4% |
| FY2024 (Jan 28, 2024) | 24.64B | −0.1% | $9.5B | $3.5B | 6% |
| FY2023 (Jan 29, 2023) | 24.66B | −1.6% | $10.0B | $2.7B | 10% |
| FY2022 (Jan 30, 2022) | 25.06B | +1.1% | $0 | $2.0B | 7% |
| FY2021 (Jan 31, 2021) | 24.79B | — | $0 | $1.4B | 8% |
Shares outstanding from the balance sheets in the company's 10-K and 10-Q filings; buybacks (cash spent) and stock-based pay from its 10-Ks, via SEC EDGAR.
Over five fiscal years, buybacks more than offset the shares Nvidia issued (almost all to employees), so the share count fell slightly, but it cost about $93B in cash, plus $21B paid for employees’ taxes on vesting shares. Nvidia issued no shares for convertible debt or offerings in this period; the fiscal 2026 10-K discloses 174,676 shares issued to a key employee in connection with a December 15, 2025 acquisition, valued at about $31M (filing).
How we calculated this
Share bridge, fiscal 2022–2026 (millions of shares, adjusted for the 2024 ten-for-one split; filing, statements of shareholders’ equity):
| Step | Shares (M) |
|---|---|
| Outstanding, Jan 31, 2021 | 24,790 |
| + Common shares issued (employee stock plans, plus 0.2M in a December 2025 acquisition) | +1,288 |
| − Withheld for employees’ taxes on vesting | −342 |
| − Repurchased | −1,433 |
| = Reported outstanding, Jan 25, 2026 | 24,304 (−2.0%; the lines above sum to 24,303 because of rounding) |
The bridge sums the share lines in each year’s equity statement (fiscal 2022–23 lines × 10 for the split).
Prices paid and received:
| Period | Shares bought back | Average price paid | Spent | Shares sold for cash | Average price received | Raised | Sources |
|---|---|---|---|---|---|---|---|
| Fiscal 2022 | 0 | — | $0 | — | — | — | 10-K FY2024 |
| Fiscal 2023 | 630 | $15.93 (our calculation) | $10,039 | — | — | — | 10-K FY2024 |
| Fiscal 2024 | 211 | $46.19 (our calculation) | $9,746 | — | — | — | 10-K FY2026 |
| Fiscal 2025 | 310 | $109.73 (our calculation) | $34,015 | — | — | — | 10-K FY2026 |
| Fiscal 2026 | 282 | $143.22 (our calculation) | $40,388 | — | — | — | 10-K FY2026 |
| Fiscal 2027 to Jul 26, 2026 (first half) | 203 | $196.28 (our calculation) | $39,845 | — | — | — | 10-Q Q2 FY2027 |
Nvidia bought back 1,433M shares for about $94.2B over fiscal 2022–26, at an average of $65.73 a share (our calculation). It sold no shares for cash, so the prices it paid are the only prices to compare.
- Units: shares and dollars in millions, adjusted for the 2024 ten-for-one split5.
- “Spent” is the repurchase cost recorded in the statements of shareholders’ equity; cash paid differs slightly with settlement timing.
- Average price paid is our calculation6.
- Shares withheld for employees’ taxes on vesting (342M over fiscal 2022–26) are excluded; Nvidia does not report them as repurchases.
- Nvidia sold no shares for cash (no offerings or at-the-market sales) in this period.
- For reference, the stock closed at $210.96 on Oct 23, 2026 (Nasdaq via Yahoo Finance).
| Fiscal year | Buyback cash ($B) | Shares repurchased (M) | Stock-based pay ($B) | Stock pay % of revenue7 |
|---|---|---|---|---|
| 2022 | 0.0 | 0 | 2.0 | 7.4% |
| 2023 | 10.0 | 630 | 2.7 | 10.0% |
| 2024 | 9.5 | 211 | 3.5 | 5.8% |
| 2025 | 33.7 | 310 | 4.7 | 3.6% |
| 2026 | 40.1 | 282 | 6.4 | 3.0% |
Stock-based pay has fallen from 7.4% to 3.0% of revenue over the period, and the diluted share count is lower than five years ago.
- Diluted weighted-average shares fell from 25,100M in fiscal 2021 to 24,514M in fiscal 2026 (−2.3%).
- In the first half of fiscal 2027, Nvidia repurchased 203M shares at a recorded cost of $39.8B (cash paid $39.0B).
- 24.1 billion shares were outstanding on Aug 21, 2026 (filing).
Sources8
5. Profit vs cash (latest FY and TTM)
Last updated Oct 27, 2026. Reflects the fiscal 2026 10-K and the Q2 fiscal 2027 10-Q.
Operating cash flow ran below profit in fiscal 2026 and the trailing 12 months. The gap is mostly unrealised investment gains (profit without cash) and cash tied up in receivables and inventory, which delays cash conversion, with recovery depending on customer payments and inventory sales; stock-based pay is the item that costs holders over time. Nvidia attributes the latest rise in collection days to extended customer payment terms and the inventory build to preparations for Vera Rubin.
| $ billions | Fiscal 2026 | Trailing 12 months (TTM) to Jul 26, 20269 |
|---|---|---|
| Net income under US accounting rules (GAAP) | 120.1 | 192.9 |
| Company-adjusted net income (non-GAAP) | 117.0 (excluded stock pay) | Not on one basis (definition changed in Q1 FY2027); first half FY2027: 99.5 (now includes stock pay) |
| Operating cash flow | 102.7 | 134.4 |
| Free cash flow (company definition)10 | 96.6 | 126.9 |
Helps future profit or cash:
- Receivables (−$15.4B in fiscal 2026): sales are in profit but not yet collected, so the cash arrives if and when customers pay; longer payment terms delay it.
- Inventory (−$11.3B): cash tied up in stock for new products; selling it can release cash, while obsolescence or lower selling prices can reduce recovery.
Hurts future profit or cash:
- Stock-based pay (+$6.4B added back): a real cost paid in shares rather than cash: it adds no cash outflow, but it dilutes ownership unless buybacks offset it (section 4 shows the net effect).
One-off / no lasting effect:
- Net gains on equity investments (−$8.9B): profit without operating cash; any cash comes only if the stakes are sold, and it then appears under investing cash flow.
The raw reconciling items
Fiscal 2026, filing:
- Net gains on equity investments: −$8.9B. These gains are part of profit but are removed from operating cash flow; any cash from selling investments appears under investing cash flow. The TTM adjustment was −$30.6B (our calculation).
- Receivables: −$15.4B. Sales grew faster than collections; in the TTM, receivables absorbed $35.2B (our calculation) as some large buyers received longer terms.
- Inventory: −$11.3B, building stock for new products (TTM −$16.6B, our calculation).
- Stock-based pay: +$6.4B, a non-cash expense added back in operating cash flow. Employee share issuance can dilute ownership; section 4 shows the net effect after buybacks.
Separately, Nvidia spent $35.2B net on equity stakes in the first half of fiscal 2027 (our calculation)11; these sit outside free cash flow.
Funding: how long without new money? Self-funding: $126.9B of free cash flow in the last 12 months (TTM to Jul 26, 2026; our calculation)12; $5.75B of notes fall due by Jul 2028, against $56.6B of cash and marketable securities.
Funding details
- Based on past cash flow; spending plans can change it.
- Free cash flow is before equity investments ($35.2B net in the first half of fiscal 2027), dividends and buybacks, and Nvidia also issued $25B of notes in June 2026, so it is not a forecast of future funding.
- As of Jul 26, 2026: cash, cash equivalents and marketable debt securities of $56.6B, plus $47.7B of listed equity holdings (of which $36.9B was under short-term lock-ups and $5.0B locked through December 2027, temporary restrictions on selling; 10-Q Q2 FY2027, Note 5), against $33.4B of debt (filing).
- No convertible notes; no at-the-market share-sale programme is disclosed.
Extends the runway:
- No revolving credit facility is disclosed, and no committed undrawn financing is disclosed.
Shortens the runway:
- Debt due within 24 months: at Jul 26, 2026, $5.75B of notes were scheduled to mature by Jul 2028: the $1.0B 3.20% notes due Sep 16, 2026 (a date that has since passed), the $1.25B 1.55% notes due 2028 and the $3.5B 4.25% notes due 2028 (filing, Note 9; our sum).
- At Jul 26, 2026, disclosed commitments included $279B for supply and capacity, $29B for cloud services, $25B for Nvidia’s own data-centre leases that had not yet commenced, $25B for equity investments subject to contingencies ($18B in the remainder of fiscal 2027) and $8B for capital expenditures ($7B in the remainder of fiscal 2027); separately, $986M of Groq consideration remained accrued (10-Q, Notes 7 and 10; Q2 CFO commentary). Customer-support commitments are described in section 6.
Conditional:
- A $25B commercial paper programme (for short-term borrowing) had nothing outstanding (filing); it is not committed money.
- Guarantees of up to $108.5B (section 6) become cash obligations only if the guaranteed lessee defaults.
- The buyback authorization was raised to $235B remaining on Sep 28, 2026 (Nvidia); an authorization is optional, not an obligation.
Sources13
6. Customer and contract exposure
Last updated Oct 27, 2026. Reflects the fiscal 2026 10-K and the Q2 fiscal 2027 10-Q.
A handful of buyers account for much of Nvidia’s sales: one direct customer was 22% of fiscal 2026 revenue, and Nvidia increasingly supports the finances of the customers behind them through guarantees, purchase commitments and equity stakes. If those customers cannot pay or renew, the revenue and the guarantees are both affected.
Chart source14.
Customer and contract details
| Period | Largest direct customers (% of revenue; Nvidia does not name them) |
|---|---|
| Fiscal 2024 | 13% |
| Fiscal 2025 | 12%, 11%, 11% |
| Fiscal 2026 | 22%, 14% |
| First half fiscal 2027 | 16%, 15%, 13% |
- Nvidia’s direct customers include manufacturers, distributors, system integrators, cloud providers and AI model makers. Five customers held 70% of receivables on Jul 26, 2026 (filing).
- Indirect customers: Nvidia says one unnamed “AI research and deployment company” contributed a meaningful amount of revenue by buying cloud services from its customers (filing). Hyperscale customers (public clouds and the world’s largest consumer internet companies) were 51% of Q2 revenue (filing; our calculation)15.
- Customer support and financing (filing): payment terms of 90 days to a year for some investment-grade buyers; $36B of commitments to buy cloud capacity from AI cloud partners (which shrink as the partners resell it); $20B of future data-centre lease commitments that Nvidia expects to reassign to third parties; guarantees of up to $108.5B, of which $105B relates to OpenAI’s leases at SB Energy’s Ohio campus.
- The $105B SB Energy/OpenAI guarantees become effective in phases as leases commence, with the first phase expected in fiscal 2029, Nvidia says. If OpenAI defaults, Nvidia generally covers the shortfall between a guaranteed lease value and recoveries from reletting or selling the property, subject to contractual conditions.
- Named relationships (company statements): OpenAI (equity investment; about 12 gigawatts of existing and planned Nvidia compute); AWS (an additional 2 million GPUs through Q2 fiscal 2029); Anthropic (Nvidia committed to invest up to $10B, announced Nov 18, 2025; Nvidia); and Meta (a planned $3B investment in Meta’s equity offering alongside an expanded AI partnership, announced Oct 26, 2026; Nvidia).
- Geography (by customer headquarters, Q2 fiscal 2027): US 62%, Taiwan 28%, China including Hong Kong 8% (filing; our calculation). Nvidia said shipments of Data Center Hopper products to China were less than 1% of Data Center revenue in Q2.
- No government is a disclosed major customer.
Sources16
7. What to watch
Last updated Nov 17, 2026. Reflects the 10-Q for Q2 fiscal 2027, the Q3 fiscal 2027 release and CFO commentary (Nov 17) and company announcements through Nov 17, 2026.
| Date | Item | Source |
|---|---|---|
| In the coming weeks | The 10-Q for Q3 fiscal 2027, with the customer, receivables, guarantee and legal notes not in the Nov 17 release | CFO commentary |
| Dec 1, 2026 | Keynote at GTC Washington, D.C. | Nvidia |
| Late Feb 2027 (estimated; date not confirmed) | Q4 fiscal 2027 results and 10-K: revenue against the $130.0B ±3% guide and whether gross margin lands at 71–72% as guided, plus updated customer, commitment and guarantee disclosures | — |
| 1H 2027 | Expected closing of the Hugging Face acquisition, subject to regulatory approvals | 8-K |
| Calendar 2028 | Note maturities: $3.5B 4.25% and $1.25B 1.55% notes due 2028 | 10-Q, Note 9 |
| Fiscal 2029 onward (expected) | SB Energy/OpenAI guarantees become effective as individual leases commence, subject to construction completion and contractual conditions | 8-K |
Links in the table accessed Oct 27, 2026.
Valuation at each update
| Update | Close | Market value | EV | P/S | EV/sales | P/E | P/FCF | Revenue growth | FCF margin | Net cash (debt) | Basis |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Oct 27, 2026 | $210.96 (Oct 23) | $5.13T | $5.10T | 16.9× | 16.8× | 26.6× | 40.4× | +83% | 42% | $23.2B | 12 months to Jul 26, 2026 |
Our calculation from each update's filings (latest at the newest update: 10-Q for the quarter to Jul 26, 2026, filed Aug 26, 2026); not investment advice. n/m = not meaningful (e.g. negative earnings). Hover a heading for its definition. Oct 27, 2026 row: Corrected Oct 30, 2026: cash and investments now include short-term marketable securities ($56.6 billion, previously $22.4 billion); net cash $23.2 billion (previously net debt of $10.9 billion), enterprise value $5.10 trillion (previously $5.14 trillion) and EV/sales 16.8× (previously 17.0×). Price and date unchanged.
Notes and calculations
-
Each line ÷ total revenue. ↩
-
Accessed Oct 27, 2026: 10-K FY2026 (revenue by market) · Q2 FY2027 CFO commentary ↩ ↩2
-
Accessed Nov 17, 2026: Q3 FY2027 release · Q3 FY2027 CFO commentary · Q2 FY2027 CFO commentary · Q2 call transcript · Q3 call transcript (The Singju Post) · + 1 more: CEO transition 8-K ↩
-
Net shares issued = 1,288M issued − 342M withheld for taxes = 946M. Change = 24,304 ÷ 24,790 − 1; annual rate = (24,304 ÷ 24,790)^(1/5) − 1; remaining ownership = 1% × 24,790 ÷ 24,304; offset = 1,433 ÷ 946. ↩
-
Fiscal 2022–23 shares × 10. ↩
-
Spent ÷ shares bought back. ↩
-
Stock-based compensation expense ÷ revenue (our calculation). ↩
-
Accessed Oct 27, 2026: 10-K FY2024 · 10-K FY2026 · 10-Q Q2 FY2027 · + 1 more: SEC XBRL company facts ↩
-
Our calculation for TTM: fiscal 2026 − first half fiscal 2026 + first half fiscal 2027. ↩
-
Free cash flow is operating cash flow minus purchases of property, equipment and intangible assets and minus principal payments on them (company definition). ↩
-
Purchases $42.4B − sales $7.2B, filing. ↩
-
Operating cash flow − capital spending (company definition), TTM = fiscal 2026 − first half fiscal 2026 + first half fiscal 2027. ↩
-
Accessed Oct 27, 2026: Q4 FY2026 release (reconciliations) · 10-K FY2026 (cash flow statement) · Q2 FY2027 release ↩
-
Accessed Oct 27, 2026: 10-K FY2026 · 10-Q Q2 FY2027 · 8-K Aug 17, 2026. Shares of revenue are as disclosed; geography is our calculation. The $3.5 billion for AI-cloud partners’ leases is the $108.5 billion total guarantees less the $105 billion OpenAI guarantees (our calculation). ↩
-
$48.7B ÷ $96.2B. ↩
-
Accessed Oct 27, 2026: 10-K FY2026 · 10-Q Q2 FY2027 (Notes 7, 8, 10, 13) · 8-K Aug 17, 2026 · + 1 more: Q2 call transcript ↩
Quoting this? You may quote short excerpts under our reuse policy. Please credit WhyMyStockMoved.com and link to this page.
About Nvidia: Website (external site)Investor relations (external site)SEC filings (external site)Wikipedia (external site)