← GEV: big moves and long-term fundamentals中文

GE Vernova: The Long View

What the filings say about its story, dilution and cash runway.

Last updated Oct 28, 2026 · Reflects: 10-K for 2025 and the 10-Q for Q3 2026

This page is information, not investment advice.

1. In one paragraph

Last updated Oct 28, 2026. Reflects the 10-K for 2025 and the 10-Q for Q3 2026.

GE Vernova makes and services the equipment that generates and moves electricity: gas, steam, nuclear and hydro turbines; onshore and offshore wind turbines; and transformers, switchgear and grid software. General Electric spun it off on Apr 2, 2024. In 2025 revenue was $38.1B (+9%). It reports three segments (10-K 2025, note 24):

  • Services were 44% of segment revenue (our calculation)1, and the US was 46% of revenue (our calculation)2.
  • At Dec 31, 2025, its installed base included about 7,000 gas turbines, about 1,800 of them under long-term service agreements with an average remaining life of about 10 years.
2025 (disclosed; shares are our calculation)3 Revenue Share Segment EBITDA (earnings before interest, taxes, depreciation and amortization, as defined by the company)
Power (mainly gas turbines and their servicing) $19.77B 51% $2.90B
Electrification (grid equipment, power conversion, software) $9.64B 25% $1.43B
Wind (onshore, offshore, blades) $9.11B 24% −$0.60B

From Jan 1, 2026 the company moved some business units between segments, and Electrification now includes Prolec GE, a transformer maker bought in February 2026. On Oct 25, 2026 GE Vernova agreed to buy Trench Group, a Berlin-based maker of high- and medium-voltage grid components, for about €8.0B ($9.0B), with closing expected in late 2027 (10-Q Q3 2026; Trench release).

2. Story so far

Last updated Oct 28, 2026. Reflects filings and company releases through Oct 28, 2026.

In short: GE Vernova left General Electric in April 2024; that year its adjusted EBITDA margin was 5.8% and Wind lost money (Q4 2024 release). Demand for gas turbines and grid equipment, including from data centers, has since lifted orders, prices and customer down payments. Cash generation has supported buybacks and a larger dividend. The $5.3B Prolec GE purchase was funded with cash and debt, and management expects to fund the pending $9.0B Trench Group purchase the same way, half each. Wind, after losses, reported positive segment EBITDA in Q3 2026 (Q3 2026 release).

Date Milestone Source
Apr 2, 2024 ★ Spin-off from General Electric completes; 274.1M GE Vernova shares start trading on the NYSE 10-K 2025, note 16
Jul 2024 A turbine blade event at the Vineyard Wind offshore farm, which uses GE Vernova’s Haliade-X turbines 10-K 2024
Dec 10, 2024 ★ First dividend ($0.25 a quarter) and a $6B buyback authorization Company release
Jan 28, 2025 Chevron and Engine No. 1 plan gas power plants for US data centers using seven GE Vernova 7HA turbines held under a slot reservation agreement (a deposit-backed hold on future production) Chevron release
Jul 22, 2025 Crusoe, an AI data-center developer, announces orders for 29 LM2500XPRESS aeroderivative gas turbines (nearly 1 gigawatt, GW) Company release
Oct 2025 Agrees to buy the remaining 50% of Prolec GE from Xignux for $5.275B Q3 2025 release
Dec 9, 2025 Buyback authorization raised to $10B; quarterly dividend doubled to $0.50 10-K 2025, Item 5
Jan 28, 2026 2025 results: orders $59.3B, backlog (contracted revenue not yet recognised) $150B. Net income includes a $2.9B tax benefit from releasing a US valuation allowance. 2028 outlook raised to $56B of revenue and a 20% adjusted EBITDA margin Q4 2025 release
Feb 2–4, 2026 Prolec GE purchase closes (about $5.3B cash), and GE Vernova sells $2.6B of senior notes to fund part of it Q1 2026 release, 10-Q Q2 2026, note 14
Jul 22, 2026 ★ Q2: orders $24.2B (+88% organic, i.e. excluding acquisitions, disposals and currency), backlog $176B, free cash flow $5.1B. 2026 free-cash-flow guide raised to $11.5–12.5B, from $6.5–7.5B Q2 2026 release
Aug 25, 2026 CFO Ken Parks to retire on Apr 2, 2027; Claire McDonough, Rivian’s CFO, becomes CFO on Jan 1, 2027 8-K
Oct 22, 2026 GE Vernova closes down 10.6% at $827.42. Our coverage attributed the fall to a sell-off in AI-power stocks after Meta’s results and cited Investing.com’s report (reported) that no GE Vernova announcement triggered it. Start of our coverage; see also our Big Picture on AI build-out stocks WhyMyStockMoved
Oct 25–28, 2026 ★ Agrees to buy Trench Group for about €8.0B ($9.0B), which management currently expects to fund equally with cash and debt. Q3: orders $29.3B, backlog $196.7B; 2026 free-cash-flow guide raised again, to $16–17B; buyback authorization raised to $20B. Vineyard Wind claims with the customer resolved Q3 2026 release, 10-Q Q3 2026

3. Latest quarter: did the story change?

Last updated Oct 28, 2026. Reflects Q3 2026 (quarter to Sep 30, released Oct 28) and the same-day earnings call. Our review of the quarter: GE Vernova Q3 2026: did the story change?

Bottom line: According to the Oct 28 release, orders, revenue, margins and free cash flow all rose from Q2, and management raised its 2026 revenue, margin and free-cash-flow guidance; Electrification orders fell from a year earlier, and Wind’s full-year segment EBITDA loss guide widened even though the segment’s EBITDA was positive in Q3.

Driver Last quarter → this quarter Management: before → now Signal
Orders and gas pipeline Orders $24.2B (+88% organic) → $29.3B (+96%); gas backlog plus slot reservations 116 GW → 122 GW, with backlog (64 GW) now larger than reservations (58 GW) Year-end 2026 gas target: at least 125 GW (Jul 22) → at least 130 GW (Oct 28). CEO Scott Strazik said full-year 2026 gas order pricing per kilowatt (kW) would be about 50% above 2025 (call, reported) Better
Revenue and margins Revenue $11.1B (+22%) → $12.6B (+27%); adjusted EBITDA margin 11.3% → 15.4%; Power segment margin 18.8% → 21.4% 2026 guide: revenue $45.5–46.5B, adjusted EBITDA margin 12–14% (Jul 22) → $46.5–47.5B, 13.5–14.5% (Oct 28); Power margin 17–19% → 19–21% Better
Electrification Orders $6.3B (+66% organic) → $5.4B (−9%); segment EBITDA margin 18.4% → 19.1% Revenue guide $14.5–15.0B (Jul 22) → unchanged (Oct 28); margin guide of 18–20% now trending toward the higher end. CFO Ken Parks attributed the order decline to a $1.6B synchronous condenser order in Saudi Arabia a year earlier (call, reported) Watch
Wind Segment EBITDA −$275M → +$72M; orders −40% → +16% organic 2026 segment EBITDA guide: loss of about $400M (Jul 22) → loss of $400–500M (Oct 28), which implies positive Q4 segment EBITDA (our calculation)4; organic revenue guide improved from down low-double digits to down mid-single digits. Parks cited scheduled maintenance pulled forward from 2027 into Q4 and the Vineyard Wind settlement (call, reported) Worse
Free cash flow $5.1B → $5.4B, again mostly from customer down payments 2026 guide: $11.5–12.5B (Jul 22) → $16–17B (Oct 28), after $15.3B in the first nine months; Parks expects positive Q4 free cash flow (call, reported) Better

Sources: Q2 2026 release, Q3 2026 release; call remarks from the transcript by Quartr, published by Stock Analysis (reported). Adjusted EBITDA and organic growth are company measures, reconciled in the releases.

Unresolved questions: whether gas reservations keep converting into orders at higher prices (Strazik said Q4 gas pricing per kW would be lower than Q3’s); how much of this year’s cash came from down payments that will be spent building the equipment; whether Trench gets its regulatory approvals by late 2027.

4. Buybacks vs real dilution (5 years)

Last updated Oct 28, 2026. Reflects the 10-K 2024, the 10-K 2025 and the 10-Q Q3 2026. GE Vernova has traded only since Apr 2, 2024, so the period starts then.

Dilution in one line: From Apr 2, 2024 to Sep 30, 2026 the share count fell 3.4%, about 1.4% a year compounded (our calculation)5. If you owned 1% of GE Vernova at the spin-off, you’d own about 1.04% on Sep 30, 2026 without buying more (our calculation)6. Buybacks offset all the new shares, about 2.8 times over (our calculation)7. Our scale: Net reduction (the share count fell).

Our rule of thumb: under 1% a year low, 1–3% moderate, over 3% high.

Change in shares outstanding, Apr 2, 2024 to Sep 30, 2026FY2024 +0.7%, FY2025 −2.3%, 9M 2026 −1.8%. Total −3.4% since Apr 2, 2024.−4%−3%−2%−1%0%+1%FY2024: +0.7% in the period; +0.7% since Apr 2, 2024+0.7%FY2024FY2025: −2.3% in the period; −1.7% since Apr 2, 2024−2.3%FY20259M 2026 (part year): −1.8% in the period; −3.4% since Apr 2, 2024−1.8%9M 2026−3.4% since Apr 2, 2024

Change in the period Total since Apr 2, 2024 Part year

Shares outstanding at period end (all classes): 274.1M on Apr 2, 2024, 264.7M on Sep 30, 2026, −3.4% (our calculation). A bar below zero means the count fell (net buybacks).

Period endShares outstandingChangeBuybacks (fiscal year)Stock-based pay (fiscal year)Stock pay as % of revenue
9M 2026 (Sep 30, 2026)264.7M−1.8%———
FY2025 (Dec 31, 2025)269.5M−2.3%$3.3B$257M1%
FY2024 (Dec 31, 2024)275.9M+0.7%$43M$155M0%
Apr 2, 2024274.1M————

Shares outstanding from the balance sheets in the company's 10-K and 10-Q filings; buybacks (cash spent) and stock-based pay from its 10-Ks, via SEC EDGAR.

How we calculated this
Share bridge, Apr 2, 2024 → Sep 30, 2026 (our calculation from disclosed share and treasury counts; millions) Shares
Start (Apr 2, 2024) 274.09
+ Shares issued for employee stock awards (2.02 in 2024, 1.82 in 2025, 1.13 in 2026 to Sep 30; change in shares outstanding plus change in treasury shares) +4.97
− Shares withheld for employee taxes in 2024 and held in treasury −0.22
− Shares repurchased (0.01 in 2024, 8.17 in 2025, 5.98 in 2026 to Sep 30) −14.16
End (Sep 30, 2026) 264.68 (−3.4%)
Shares issued for acquisitions, convertibles or offerings None in the period

Totals use unrounded filing figures. Shares outstanding: 274,085,523 (Apr 2, 2024), 275,880,314 (Dec 31, 2024), 269,529,464 (Dec 31, 2025), 264,677,066 (Sep 30, 2026); treasury shares: 226,290, 8,397,266 and 14,381,479 at the same year-end and September dates.

Prices paid and received:

Period Shares bought back Average price paid Spent Shares sold for cash Average price received Raised Sources
2024 (from Apr 2) 0.008M $337.39 $2.7M — — — 10-K 2024, Item 5: 8,000 shares in December
2025 8.17M $406 (company figure; our calculation $405.838) $3,316M — — — Quarterly tables in the Q1, Q2, Q3 10-Qs and 10-K 2025 (3,980k + 1,194k + 1,097k + 1,900k shares); $3,316M per 10-K note 16
2026 YTD (to Sep 30) 5.98M $881.35 (our calculation)9 $5,274M — — — 10-Q Q1 2026: 1,799k shares, $1,295M ($719.59); 10-Q Q2 2026: 2,467k shares, $2,350M ($952.47); 10-Q Q3 2026: 1,718k shares, $1,630M ($948.72)

GE Vernova bought back far more stock than it issued and sold no shares for cash, so the prices it paid are the only prices to compare.

Notes on the prices table
  • Spent excludes commissions and excise taxes; the equity statements, which include them, show about $3.34B (2025) and $5.32B (2026 to Sep 30).
  • GE Vernova has not split its stock.
  • Buybacks exclude the 218,290 shares withheld for employee taxes in 2024 ($40M), which the company reports separately.
  • GE Vernova sold no shares for cash in the period; the February 2026 offering was debt.
  • After the quarter, it bought about 1.4M more shares for $1.3B from Oct 1 to Oct 23, 2026. In October the board raised the authorization to $20B, with $10.1B remaining (Q3 2026 release).
  • For reference, Stock Analysis reports an Oct 26, 2026 closing price of $855.12 (Stock Analysis).
Diluted shares and stock pay (disclosed; % is our calculation) 2024 2025 2026 to Sep 30
Weighted diluted shares (M) 278 276 270
Stock-based pay ($M) 155 257 194
Stock pay as % of revenue10 0.4% 0.7% 0.6%

At Dec 31, 2025, awards outstanding were 2.11M options (average exercise price $144.04), 1.34M restricted stock units and 1.16M performance share units, together about 1.7% of shares outstanding (our calculation)11 (10-K 2025, note 17).

5. Profit vs cash (latest FY and TTM)

Last updated Oct 28, 2026. Reflects the 10-K 2025, the Q4 2025 release, the Q3 2026 release and the 10-Q Q3 2026. TTM = the four quarters to Sep 30, 2026 (our calculation)12.

Cash flow has run far ahead of adjusted profit, because customers are paying deposits on equipment years before delivery. Net income, meanwhile, includes two large non-cash gains.

$M 2025 (disclosed unless marked otherwise) TTM (our calculation)
Net income (including minority interests) 4,879 10,357
Adjusted EBITDA (company reconciliation: net income excluding restructuring, deal gains, separation costs, non-operating pension income, depreciation and amortization, interest and taxes) 3,196 5,247
Operating cash flow 4,987 19,216
Capital spending (additions to property, plant, equipment and internal-use software) 1,277 2,101
Free cash flow (the company’s definition)13 3,710 17,115

Helps future profit or cash:

  • Rising receivables and inventories took about $4.2B and $2.4B TTM as the business grew: this ties up cash in receivables, supplier advances and inventory; whether it comes back depends on collections, deliveries and sales.

Hurts future profit or cash:

  • Customer down payments (contract liabilities and current deferred income added about $8.0B to operating cash flow in 2025 and $25.1B TTM; our calculation)14: the cash arrives before the revenue, so the revenue later recognised brings no new cash, and the money is used to build the equipment.
  • Income taxes paid in cash were about $3.0B TTM, a cash cost inside operating cash flow.

One-off / no lasting effect:

  • A $2.9B tax benefit in Q4 2025 from releasing a valuation allowance on US deferred tax assets: it raised profit, not cash.
  • A gain of about $4.0B in Q1 2026 from revaluing the 50% of Prolec GE it already owned: it raised profit, not cash (Q3 2026 release).
  • About $350M paid in Q3 2026 to transfer part of its retiree benefit obligations to an insurer: a one-time cash cost inside operating cash flow (Q3 2026 release).
The raw reconciling items
  • Changes in contract liabilities and current deferred income added about $8.0B to operating cash flow in 2025 and $25.1B TTM (our calculation)14, driven mainly by customer down payments and partly offset by revenue recognition. The 10-Q attributes the increase to down payments on orders and slot reservations at Power, and at Electrification. This cash arrives before the revenue and will be used to build the equipment.
  • Two non-cash gains raised profit but not cash: a $2.9B tax benefit in Q4 2025 from releasing a valuation allowance on US deferred tax assets, and a gain of about $4.0B in Q1 2026 from revaluing the 50% of Prolec GE it already owned.
  • Rising receivables and inventories took about $4.2B and $2.4B TTM as the business grew.
  • Income taxes paid in cash were about $3.0B TTM.
Self-funding

Funding: how long without new money? Self-funding: about $17.1B of free cash flow in the 12 months to Sep 30, 2026 (our calculation)15; only $31M of debt and finance leases is current and no senior notes mature before February 2031, against about $16.8B of cash and restricted cash.

Funding details
  • As of Sep 30, 2026. Based on past cash flow; spending plans can change it.
  • Cash, cash equivalents and restricted cash: about $16.8B, of which $0.4B is restricted; no separate marketable securities are reported (10-Q).
  • At-the-market share-sale programme: none disclosed.
  • Buybacks are discretionary: $10.1B of the $20B authorization remained after purchases through Oct 23, 2026 (Q3 2026 release).

Extends the runway:

  • Undrawn credit lines: a $3.0B revolving credit facility, undrawn, maturing Apr 2, 2029.

Shortens the runway:

  • Debt and finance leases: $31M is classified as current at Sep 30, 2026. The filing does not separately quantify the full amount due through Sep 30, 2028. No senior notes mature in that window; they mature in February 2031 ($600M), February 2036 ($1.0B) and February 2056 ($1.0B).
  • Trench Group purchase: about €8.0B ($9.0B), which the company expects to fund equally from cash and debt, so about $4.5B of cash (our calculation)16. Closing is expected in late 2027. If regulatory approvals are not obtained in time, GE Vernova owes a termination fee (amount not disclosed), payable no earlier than the second half of 2027 (10-Q Q3 2026, Part II, Item 5).

Conditional:

  • A separate $3.0B facility for letters of credit and bank guarantees is not a cash line.

6. Customer and contract exposure

Last updated Oct 28, 2026. Reflects the 10-K 2025 and the 10-Q Q3 2026.

Revenue is spread across utilities, power producers, industrial companies and governments worldwide; the bigger exposure is the size and length of the backlog: $196.7B at Sep 30, 2026, a little under half of it services, plus 58 GW of gas-turbine slot reservations that are not yet firm orders.

GE Vernova backlog by type, Sep 30, 2026
Equipment: $104BEquipment$104BServices: $92.7BServices$92.7B
Show the data
Label Value Unit
Equipment 104.1 $ billions
Services 92.7 $ billions
GE Vernova revenue by region, 2025
United States: $17.3BUnited States$17.3BEurope: $7.6BEurope$7.6BMiddle East and Africa: $5.4BMiddle East and Africa$5.4BAsia: $4.6BAsia$4.6BOther Americas: $3.1BOther Americas$3.1B
Show the data
Label Value Unit
United States 17.3 $ billions
Europe 7.6 $ billions
Middle East and Africa 5.4 $ billions
Asia 4.6 $ billions
Other Americas 3.1 $ billions

Chart source17.

Customer and backlog details
  • We found no customer disclosed at 10% or more of revenue in the 10-K for 2025 or the latest 10-Q.
  • In 2025, 46% of revenue came from the US (our calculation, above). The rest came from Europe ($7.6B), the Middle East and Africa ($5.4B), Asia ($4.6B) and other Americas ($3.1B).
  • Remaining performance obligations (the backlog) were $196.7B at Sep 30, 2026. That is $104.1B of equipment (33% expected within 1 year, 60% within 2) and $92.7B of services (16% within 1 year, 54% within 5). Disclosed.
  • Slot reservation agreements for gas turbines (58 GW at Sep 30, 2026) are counted separately from the 64 GW in backlog. The 10-K warns that some counterparties may not place orders equal to their reservations, or at all.
  • On the Oct 28 call, Strazik said “total segment data center orders are now more than $6 billion year to date” and that about 20% of gas demand was for data centers (Quartr transcript via Stock Analysis, reported). In July, the Electrification segment’s data-center orders were over $5B for the first half (Q2 2026 release).
  • The 10-K names hyperscalers (large cloud and data-center operators) among newer customer types whose credit and contracting practices may differ. Government customers can often terminate contracts for convenience.
Key contract Signed Term or timing Size Note
Crusoe aeroderivative turbines Dec 2024 (10) and Jun 2025 (19) Not disclosed 29 LM2500XPRESS units, nearly 1 GW For AI data centers (company release)
Chevron and Engine No. 1 power plants Jan 28, 2025 (announced) Initial service targeted by end-2027 Seven 7HA turbines, up to 4 GW planned Under a slot reservation agreement (Chevron release)
Ontario Power Generation, Darlington Jan 2023 Construction licence Apr 2025 First BWRX-300 small modular reactor (GE Hitachi design) Reactor contract with partners (GE Hitachi release); licence per the Canadian Nuclear Safety Commission
SunZia wind (New Mexico) Not disclosed Operational by Q2 2026 3.8-megawatt (MW) turbines Company calls it the largest renewable project in US history (Q2 2026 release)
Vineyard Wind (Massachusetts, offshore) Not disclosed Remaining turbines expected to be commissioned in early 2027 Haliade-X turbines Claims and counterclaims with the customer resolved in Q3 2026 (10-Q Q3 2026)

7. What to watch

Last updated Oct 28, 2026. Reflects the 10-Q for Q3 2026 and company announcements through Oct 28, 2026.

Date Item Source
Nov 1, 2026 and Jan 1, 2027 Claire McDonough joins as an adviser, then becomes CFO; Ken Parks retires on Apr 2, 2027 8-K
Dec 31, 2026 Full-year guide: revenue $46.5–47.5B, adjusted EBITDA margin 13.5–14.5%, free cash flow $16–17B, Wind segment EBITDA loss of $400–500M. Gas target: at least 130 GW of backlog plus slot reservations; CEO expects backlog above $200B in Q4 Q3 2026 release
Jan 27, 2027 Q4 and full-year 2026 results, with a webcast at 7:30 a.m. ET Company events page
Late 2027 Expected closing of the Trench Group purchase, subject to regulatory approvals 10-Q Q3 2026
2028 The company’s outlook is $56B of revenue, a 20% adjusted EBITDA margin and at least $24B of cumulative free cash flow over 2025–28 (as of Jan 28, 2026; not restated in the Q3 release) Q4 2025 release

Valuation at each update

At the close used for each update, from the filings available then. Frozen when the update is published; never revised.

UpdateCloseMarket valueEVP/SEV/salesP/EP/FCFRevenue growthFCF marginNet cash (debt)Basis
Oct 28, 2026$827.42 (Oct 22)$219.0B$205.1B5.0×4.7×21.1×12.8׆+17%39%†$13.9B12 months to Sep 30, 2026

Our calculation from each update's filings (latest at the newest update: 10-Q for the quarter to Sep 30, 2026, filed Oct 28, 2026); not investment advice. n/m = not meaningful (e.g. negative earnings). Hover a heading for its definition. Oct 28, 2026: † Free cash flow includes $25.1B of customer prepayments (increase in contract liabilities) in the 12 months to Sep 30, 2026.

Notes and calculations

  1. $17,098M ÷ $38,519M. ↩

  2. $17,341M ÷ $38,068M. ↩

  3. Segment revenue ÷ $38,519M total segment revenue. ↩

  4. Wind segment EBITDA was −$585M in the first nine months of 2026. A full-year loss of $400–500M implies Q4 segment EBITDA of about +$85M to +$185M: −$400M − (−$585M) = +$185M; −$500M − (−$585M) = +$85M. ↩

  5. Change = 264.677 ÷ 274.086 − 1; annual rate = (264.677 ÷ 274.086)^(1/2.49) − 1, over 2.49 years (Apr 2, 2024 to Sep 30, 2026). ↩

  6. 1% × 274.1M ÷ 264.7M. ↩

  7. 14.16M shares bought back ÷ 4.97M issued = 14.163 ÷ 4.973. ↩

  8. $3,316M ÷ 8.171M. ↩

  9. $5,274M disclosed nine-month repurchase spending (10-Q Q3 2026) ÷ 5.984M shares from the three quarterly issuer-purchase tables. The rounded quarterly spending figures sum to $5,275M. ↩

  10. Stock pay ÷ revenue (2026: $194M ÷ $33,084M for the nine months). ↩

  11. 4.62M ÷ 269.5M. ↩

  12. 2025 + first nine months of 2026 − first nine months of 2025. ↩

  13. Operating cash flow − capital spending. ↩

  14. $8,019M + $19,511M − $2,419M. ↩ ↩2

  15. Operating cash flow − capital spending, 12 months to Sep 30, 2026 (table above): $19,216M − $2,101M. ↩

  16. $9.0B × 50%. The price is fixed in euros (about €8.0B); the dollar figure is the company’s US-dollar equivalent in the Oct 28 release. ↩

  17. Accessed Oct 28, 2026: 10-K 2025 · 10-Q Q3 2026. The US figure is $17,341M (see note 2); regional figures are rounded as disclosed. ↩

Quoting this? You may quote short excerpts under our reuse policy. Please credit WhyMyStockMoved.com and link to this page.

About GE Vernova: Website (external site)Investor relations (external site)SEC filings (external site)Wikipedia (external site)